17
pre-operation
UNPACKING HK125fW
ASSEMBly HK125fW
1. Remove heater from carton.
2. Remove all protective material which may have been applied to the
heater for shipment.
3. Check the heater for possible shipping damage. If any damage is
found immediately contact the manufacturer
NOTE: Save the box and packaging materials for future storage.
1. Put the foot to the fuel tank holes,Insert screws in the holes and
tighten screws securely with screw driver .
2. Insert the axle to the foot hole,insert wheels ,put on axle cap and
wheel cap.
3. Fix the cord wraps to the handle, Then put the handle and foot to the
fuel tank holes ,Insert screws in the holes and tighten screws securely
with screw driver.
PRE-OPERATION
UNPACKING HK125FW
ASSEMBLY HK125FW
1. Remove heater from carton.
2. Remove all protective material which may have been applied to the
heater for shipment.
3. Check the heater for possible shipping damage. If any damage is
found immediately contact the manufacturer.
NOTE: Save the box and packaging materials for future storage.
1. Put the foot to the fuel tank holes Insert screws in the holes and
tighten screws securely with screw driver.
2. Insert the axle to the foot hole insert wheels, put on axle cap and
wheel cap.
3. Fix the cord wraps to the handle, Then put the handle and foot to the
fuel tank holes ,Insert screws in the holes and tighten screws securely
with screw driver.