Installation, Operation and Maintenance Instructions
Lifeline Medical Systems
Liquid Pressure Fully-Automatic Manifold
Basic/TAE
NFPA/ISO
Part number 4107 9013 94
Revision 03
28 March 2018
U.S. Design Patent No. D734,854
LQLQ X
Liquid x Liquid Models

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the BeaconMedaes Lifeline and is the answer not in the manual?

BeaconMedaes Lifeline Specifications

General IconGeneral
BrandBeaconMedaes
ModelLifeline
CategoryMedical Equipment
LanguageEnglish

Summary

Installation Procedures for the Manifold

Installation Precautions

Safety warnings and precautions to be followed before and during installation.

Wall Mounting Instructions

Step-by-step guide for securely mounting the manifold control panel to a wall.

Floor Mounting Instructions

Detailed instructions for assembling and mounting the manifold using floor stands.

Initial Power-Up and Operational Testing

Steps for powering up the system and performing initial functional tests.

Leak Testing Procedure

Steps for performing leak testing on the manifold system.

Operation of the Lifeline Manifold

Operational Precautions

Safety warnings and precautions to follow during normal operation of the manifold.

Manifold Changeover Process

Describes how the manifold automatically switches between primary and secondary banks.

Testing and Adjustments for Performance

Performance Verification Steps

Procedure to verify the overall functional performance of the manifold system.

Bank Regulator Adjustment Procedure

Instructions for setting and adjusting the base pressure of bank regulators.

Line Regulator Adjustment Procedure

Steps for setting and adjusting the pressure output of line regulators.

Reserve Header Regulator Adjustment

Procedure for setting the output pressure of the reserve header high-pressure regulator.

Changeover Pressure Switch Adjustment

Method for adjusting the pressure switches that control bank changeover.

Reserve Low Pressure Switch Adjustment

Procedure for adjusting the reserve low pressure switch setting.

Service Procedures for Manifold Maintenance

Service Precautions

Important safety warnings and precautions for performing service on the manifold.

TotalAlert Embedded (TAE) System Setup and Operation

Related product manuals