Yoke
Yoke block stand assembly: Remove packaging from the base, column,
and yoke block. Follow the assembly instructions in the yoke block
instruction manual to complete the assembly of these parts.
Flowmeter attachment: Remove ½ in. diameter height adjustment rod
from column. (Z bracket should already be attached to the height
adjustment rod). Use the two provided screws to fasten the Z bracket to
the Flowmeter. Replace rod into column and tighten height adjustment
knob at desired height (gure 3).
Rubber goods: Connect breathing bag to bottom of bag tee. Connect
90 adapter to front of tee. Connect corrugated breathing tube to 90°
adapter. Connect nasal inhaler to other end of breathing tube (gure 6).
Connect gas supply hoses to DISS ttings located on bottom of owmeter
(gure 5).
Test machine.
Note: If optional O2 resuscitator is purchased with machine, plug hose end
into female quick connect located on bottom of machine. Depress button
to determine O2 ows through resuscitator. For demand ow test, breathe
through face mask (gure 15).
gure 3
7