SP-7XE/F Full-Rise Scissor Lift 14 P/N 5900010Rev. B3 — September 2023
Installation Checklist SP-7XEF
Following are the steps needed to install a SP-7XEF Lift. Perform them in the order shown.
Important: Consult a Concrete Specialist about creating the Concrete Cutouts well before
beginning the installation.
1. Review the installation Safety Rules.
2. Plan for Electrical Work.
3. Make sure you have the necessary Tools.
4. Select the Installation Site.
5. Create a Floor Plan.
6. Verify there is adequate clearance on all sides of the Lift installation area.
7. Create the Concrete Cutouts.
8. Move both bases into the concrete cutouts and Lift both Platforms off their Bases onto the same
safety lock.
9. Evaluate for out of level conditions and calculate shim requirements
10. Anchor the Bases and shim as required to bring the platforms into a level condition.
11. Assemble the Console and attach the Power Unit.
12. Anchor the Console.
13. Learn about Hydraulic Fluid Contamination.
14. Learn about Thread Sealants.
15. Route, then connect the Hydraulic Hoses.
17. Learn About Compression Fittings and Tubing.
18. Route then connect the Air Lines.
20. Connect the Power Unit (Electrician required).
21. Install a Power Disconnect Switch and Thermal Disconnect Switch (Electrician required).
22. Perform an Operational Test.
23. Add the Ramp Extensions.
25. Review the Final Checklist.
26. Leave the Manual for the owner/operator.