SP-7XE/F Full-Rise Scissor Lift 14 P/N 5900010 — Rev. B3 — September 2023
Installation Checklist SP-7XEF
Following are the steps needed to install a SP-7XEF Lift. Perform them in the order shown.
Important: Consult a Concrete Specialist about creating the Concrete Cutouts well before
beginning the installation.
☐ 1. Review the installation Safety Rules.
☐ 2. Plan for Electrical Work.
☐ 3. Make sure you have the necessary Tools.
☐ 4. Select the Installation Site.
☐ 5. Create a Floor Plan.
☐ 6. Verify there is adequate clearance on all sides of the Lift installation area.
☐ 7. Create the Concrete Cutouts.
☐ 8. Move both bases into the concrete cutouts and Lift both Platforms off their Bases onto the same
safety lock.
☐ 9. Evaluate for out of level conditions and calculate shim requirements
☐ 10. Anchor the Bases and shim as required to bring the platforms into a level condition.
☐ 11. Assemble the Console and attach the Power Unit.
☐ 12. Anchor the Console.
☐ 13. Learn about Hydraulic Fluid Contamination.
☐ 14. Learn about Thread Sealants.
☐ 15. Route, then connect the Hydraulic Hoses.
☐ 17. Learn About Compression Fittings and Tubing.
☐ 18. Route then connect the Air Lines.
☐ 20. Connect the Power Unit (Electrician required).
☐ 21. Install a Power Disconnect Switch and Thermal Disconnect Switch (Electrician required).
☐ 22. Perform an Operational Test.
☐ 23. Add the Ramp Extensions.
☐ 25. Review the Final Checklist.
☐ 26. Leave the Manual for the owner/operator.