4.0
Commissioning
Note
It
is a requirement that only suitably qualified
and
competent personnel are allowed to
undertake
the commissioning of the heater.
It
is also strongly recommended that prior to commissioning the
engineer
familiarises
himself
with
the
information
contained
within
the
information
pack
that
accompanies
the
heater,
the
heater
itself,
and
with
the
specific
requirements
of
the
installation/ application. The following checks
should
be carried
out
after the familiarisation process.
Warning
All Cabinet
Heaters
undergo
a rigorous test
programme
prior to being dispatched, whilst
such
a
programme
does
involve pre-commissioning
and
setting
up
the heater to
operate
efficiently
and
well within its
designed
operational limits, this
does
not
mean
that
on
site commissioning is less
important
than
might
otherwise
be
the case. The idiosyncrasies of each installation can
only
ever
be
allowed
for,
through
the
use
of
thorough
on
site
commissioning
carried
out
by
trained
and
experienced personnel
equipped
with
the correct tools
and
apparatus.
Note
It
is strongly
recommended
that
equipment
used
for the
sampling
and
analysis of flue gases is
accurate to within
+ / -
0.1
%
and
maintained
so that it
is
regularly calibrated.
Fig 20 -
Heater
Control
Panel
J80lATE
COVER
OFF
VENTILATE MANUAL
~
~
D
ON
Fig 21 - Time Clock
Controls
Reset Button
Manual Switch Summer
and
Winter Time Setting
Enter Switching
Times
Input Times
Weekdays flash
Enter Weekday
I s
Enter minutes
22