Note
It
is
most
important
that
a
build
up
of
deposits
is
not
allowed
to
occur
as this
can
have
an
adverse
effect
upon
the
efficiency
of
the
heater
and
reduce
the life
of
the
heat
exchanger.
(f)
The
heat
exchanger
and
combustion
chamber
should
be
visually
inspected
for
signs
of
splits,
cracks,
and
distortion.
If
the
condition
of
the
heat
exchanger
gives
cause
for
concern
the
Service
Department
at
Benson
Environmental
Ltd
should
be
advised
pending
a
more
detailed
examination.
(g) All
gaskets
should
be
checked
to
ensure
that
they
continue
to
provide
a
gas
tight
seal, if
there
is
an
element
of
doubt
then they
should
be
replaced.
Electrical
Supply
All
connections
must
be
checked
to
ensure
that
they
are
secure,
and
free
from
corrosion.
Terminals
and
connections
should
also
be
checked to
ensure
that
no
stray
strands
are
bridging
terminals. Electrical
continuity
should
also
be
checked.
Oil
Supply
The
oil
supply
pipework,
tank,
and
fittings
should
all
be
inspected
to
ensure
that
they
are
free
from corrosion,
and
to
ensure
that
where
brackets
have
been
fitted these
remain
secure
and
offer
adequate
support.
The
oil filter
should
be
replaced
with
a
new
one,
and
the
system
should
be
checked
for leaks.
If
the
oil level is
such
as to
allow
removal
of
any
sludge
or
other
contaminants
from
the
tank
this
too
should
be
undertaken,
particularly
if
there
have
been
prob
l
ems
of
poor
firing
associated
with
contaminants
reaching
the burner.
Note
Any
waste
oil
or
sludge
must
be
disposed
of
correctly.
Never
dispose
of
it
by
dumping
or
tipping
it
down
drains
or
into
water
courses
where
ground
water
can
become
polluted
and
environmental
damage
caused.
Burner
Service
requirements
for
the
burner
fitted to
the
cabinet
heater
are
covered
in
the
separate
manual
prepared
by
the
burner
manufacturer.
Note
It
is
most
important
that
the
burner
is
serviced
regularly
and
in
accordance
with
the
manufacturers
instructions.
Air
Delivery
System
A
visual
inspection
should
be
undertaken
to
ensure
that
the
air
delivery
system
is
in
good
order,
that
it
remains
adequately
supported
and
that
the
various
joints are effectively sealed.
Report
A full
and
detailed
service
report
should
be
prepared,
it is
advised
that
the
report
is
not
completed
until
the
heater
has
been
re-commissioned,
where
upon
the
completed
report
can
then
be
run
through
with
the user.
5.3
Service
Re-commissioning
The
heater
must
be
re-commissioned
as
follows;
as
per
section
4.1
through
to
section
4.4
inclusive. This
must
be
regarded
as a necessary
part
of
the
heater
service
by
the
servicing engineer.