EasyManua.ls Logo

Beretta MYNUTE X C Series User Manual

Beretta MYNUTE X C Series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installer and user manual
MYNUTE X C
EN
INSTALLER AND USER MANUAL
ES
INSTRUCCIONES DE INSTALACIÓN Y USO
RO
MANUAL DE INSTALARE SI UTILIZARE
Question and Answer IconNeed help?

Do you have a question about the Beretta MYNUTE X C Series and is the answer not in the manual?

Beretta MYNUTE X C Series Specifications

General IconGeneral
BrandBeretta
ModelMYNUTE X C Series
CategoryBoiler
LanguageEnglish

Summary

Warnings and Safety

Installation Manual

Description

Provides an overview of the MYNUTE X C boiler and its ACC combustion control system.

Installation

Cleaning the system and characteristics of the water

Details on cleaning the heating system and water quality parameters for optimal boiler function.

Handling

Instructions for safely handling the boiler after unpacking.

Installation room

Guidelines for selecting and preparing the installation room for the boiler.

Installation on appliances that are old or that need to be updated

Checks and requirements for installing the boiler in existing or updated systems.

Installation regulations

Compliance with reference standards and local regulations for boiler installation.

Anti-Freeze System

Details on the automatic anti-freeze system and optional antifreeze heater kit.

Installation of condensate drain pipe

Procedure for installing the condensate drain pipe and SRD device.

Instruction for condensation exhaust connection

Guidance on connecting the condensation exhaust system according to standards.

Positioning the wall-mounted boiler and hydraulic connections

Steps for positioning the boiler and making hydraulic connections.

Electrical connections

Instructions for making low voltage and high voltage electrical connections.

Gas connection

Procedure for connecting the gas supply and verifying gas type.

Variable speed circulator

Configuration of the modulating circulator for different operating modes.

Manual reset of the circulator

Procedure for performing a manual reset on the circulator.

Removing the casing

Steps for safely removing the boiler casing to access internal components.

Flue gas exhaust and combustion air suction

Guidelines for flue gas exhaust and combustion air suction pipe installation.

Installation on collective flues in positive pressure

Requirements for installing the boiler on collective flue systems.

Filling the heating system and eliminating air

Procedure for filling the heating system and removing air.

Draining the heating system

Instructions on how to drain the heating system.

Emptying the domestic hot water circuit

Procedure for emptying the domestic hot water circuit, especially for frost protection.

Condensate siphon

Instructions for filling and checking the condensate siphon.

Control panel

Explanation of the boiler's control panel layout, buttons, and LED indicators.

Menu structure

Overview of the parameter menus (P1, P2, P3, P4, P5, P8) and their structure.

Access to the parameters

Guide on how to access and navigate the boiler's parameter settings.

Commissioning

Preliminary checks

Essential checks to perform before initial boiler start-up.

Programming the boiler

Steps for setting the time, day, and language of the boiler interface.

Boiler configuration

Detailed explanation of boiler configuration parameters within the settings menu.

Setting the thermoregulation

Instructions on how to enable and configure thermoregulation using outdoor sensors.

First commissioning

Procedure for the initial start-up and testing of the boiler.

Operating status

How to change the boiler's operating status (WINTER, SUMMER, OFF).

Adjusting the heating water temperature without an outdoor temperature sensor connected

Setting heating temperature when no outdoor sensor is installed.

Adjusting the heating water temperature with an outdoor temperature sensor connected

Adjusting heating setpoint with an outdoor sensor for thermoregulation.

Adjusting the domestic hot water temperature

Guide to setting the domestic hot water temperature.

Safety stop

Procedure for carrying out a safety stop in case of faults.

Reset function

Instructions on how to reset the boiler after an alarm.

Domestic hot water comfort function

Explanation of domestic hot water comfort functions like CSTD, CSMT, COFF.

Special domestic hot water functions

Details on advanced functions for efficient domestic hot water management.

Screed heating function

Information on activating the screed heating function for low-temperature systems.

Checks during and after the first commissioning

Post-installation checks for domestic hot water operation and system shutdown.

Combustion check

Procedure for performing a combustion analysis and adjusting settings.

Gas conversion

Instructions for converting the boiler from methane to LPG gas.

Range rated

How to set the maximum delivery for heating operation.

Lights and faults

Explanation of fault codes, error messages, and indicator lights on the display.

INFO menu

How to access and interpret information displayed in the INFO menu.

Temporary switch-off

Instructions for temporarily switching off the boiler during absences.

Switching off for lengthy periods

Procedure for long-term shutdown of the boiler.

Keyboard lockout function

How to activate or deactivate the keyboard lockout feature.

Interface Stand by

Information on the interface behavior when in stand-by mode.

Replacing interface

Procedure for replacing the boiler's interface board.

Replacing the board

Guidance on re-programming parameters after replacing the control board.

Combustion Control Parameters

Explanation of parameters related to the ACC active combustion control system.

Maintenance and Cleaning

Cleaning the primary heat exchanger

Detailed steps for cleaning the primary heat exchanger.

Cleaning the burner

Procedure for cleaning the boiler's burner.

Cleaning the siphon

Instructions for cleaning the condensate siphon and SRD device.

Maintenance of the ionisation electrode

Guidance on maintaining and replacing the ionisation electrode.

Check valve

Procedure for accessing and checking the boiler's check valve.

Removing the siphon

Step-by-step guide for removing the condensate siphon.

Programming the Boiler

First Commissioning

Operating status

How to change the boiler's operating mode between WINTER, SUMMER, and OFF.

Adjusting the heating water temperature with an outdoor temperature sensor connected

Adjusting heating setpoint with an outdoor sensor for thermoregulation.

Adjusting the domestic hot water temperature

Guide to setting the domestic hot water temperature.

Malfunctioning

Safety stop

Procedure for performing a safety stop in case of faults.

Reset function

Instructions on how to reset the boiler after an alarm.

Domestic hot water comfort function

Explanation of domestic hot water comfort functions like CSTD, CSMT, COFF.

Technical Data

Related product manuals