3
TABLE OF CONTENTS
1 SAFETY ---------------------------------------------------------- 4
2 PACKAGING, STORAGE AND MAINTENANCE ----------------- 4
2.1 Packaging
2.2 Storage
2.3 Maintenance
3 INSTALLATION PREPARATION --------------------------------- 5
3.1 Actuator & separated box configuration
3.2 Pre-requisites
4 MECHANICAL INSTALLATION ---------------------------------- 6
4.1 Fastening the actuator on the valve
4.2 Fastening the box on its support
5 WIRING ---------------------------------------------------------- 7
5.1 Opening connection compartment or connector
5.2 Installing cable glands
5.3 Wiring power and control
5.4 Closing connection compartment or connector
5.5 Wiring the external ground terminal
6 LOGIC SETTINGS ---------------------------------------------- 11