EasyManua.ls Logo

Binks SG-2 PLUS 80-600 - Pressure Conversion Kit Operation; Conversion Kit 80-619 Instructions

Binks SG-2 PLUS 80-600
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
77-2841-R6 (6/2018)8 / 12www.carlisleft.com
PRESSURE CONVERSION KITS
INSTRUCTIONS:
1. Depressurize and shut off the entire system before installing the
conversion kit.
2. Remove regulator from cup.
3. Replace gauge with gauge provided in the conversion kit.
4. Replace the regulating spring.
5. Inspect all other internal components of the regulator and replace
with new items from the conversion kit as needed and reassemble
the regulator.
6. Reassemble the regulator to the cup.
CONVERSION KIT 80-619 – Allows conversion from low (0-10 PSI) to high pressure operation.
WARNING
Attempting to install the conversion kit while
the system is pressurized could result in
damage to components or bodily injury.
!
CONVERSION ITEM 1 ITEM 2 ITEM 3
KIT HOW USED GAUGE REG. KIT SPRING (REF)
80-619 CONVERT TO 59-369 85-438 GREEN
HIGH PRESSURE (0-60 PSI) (0-50 PSI)
CONVERT TO 59-299 85-437 RED
LOW PRESSURE (0-15 PSI) (0-10 PSI)

Related product manuals