EasyManua.ls Logo

Blitz VARIS - Maintenance Schedule

Default Icon
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating instructions
Maintenance schedule
9
102620 • 05/2019
6 Maintenance schedule
The intervals mentioned are experimental values. They can differ considerably depend-
ing on the application conditions.
Key:
Measure to be carried out:
Measures to be carried out, if the operating hours are not made within
the time interval.
1
Check daily in dusty conditions and replace, if and when necessary.
Application
Interval
daily
annually
50 h
1,000 h
2,000 h
3,000 h
4,000 h
5,000 h
6,000 h
7,000 h
8,000 h
9,000 h
10,000 h
11,000 h
12,000 h
Check the oil level (cf.
chapter 5.2).
Change the oil (cf. chap-
ter 5.3).
Drain the condensation
water (cf. chapter 5.4).
Check the suction filter
cartridge and change, if
and when necessary (cf.
chapter 5.5).
Tighten the screw con-
nections (cf. chapter 5.6).
Check the compressor
valves and replace them,
if and when necessary.
Check the check valve.
Measures carried out on
(date):
Measures carried out by
(name):

Related product manuals