Be careful to assemble all components
in the sequence they are presented.
mm
Inch
18
STEP
A. Attach Weight Stack Cable (32) between Top Side Panels (G) using:
One 48 (3/8” x 3 3/4” hex head bolt)
Two 74 (3/8” washer)
Two 7 (spacer sleeve)
One 72 (3/8” nylon lock nut)
B. Route Cable (32) through the Double Pulley Holders (BB) and hold Pulley (A1) in place using:
One 52 (3/8” x 1 3/4” hex head bolt)
Two 74 (3/8” washer)
One 72 (3/8” nylon lock nut)
C. Route Cable (32) up and between Top Side Panels (G).
Route Cable (32) around Pulley (A2) and install Pulley (A2) between Top Side Panels (G) using:
One 48 (3/8” x 3 3/4” hex head bolt)
Two 74 (3/8” washer)
Two 5 (spacer sleeve)
One 72 (3/8” nylon lock nut)
D. Route Cable (32) through Single Pulley With Hook (BC) and around Pulley (A3).
Install Pulley (A3) using:
One 52 (3/8” x 1 3/4” hex head bolt)
Two 74 (3/8” washer)
One 72 (3/8” nylon lock nut)
Attach Rubber Pad (28) to the top of Single Pulley With Hook (BC) as shown.