10
When the ready indicator (green) illuminates, it shows the heating is finish. Pressing down
the pump control button “ ” to the lower position and make make two cups coffee (about
2Oz). Then close the pump and wait for 5s.
Press down the coffee/steam button “ ” to the lower position, waiting for until the green
indicator is illuminated. Make steam for 2min, then turn the steam knob to the "O" position to
stop making steam. Press the ON/OFF button “ ” to turn off the unit immediately, make the
descalers deposit in the unit at least 15 minutes.
Restart the unit and repeat the steps of 4-6 at least 3 times.
Then pressing and release the coffee/steam button “ ” to the higher position, when the
green lamp is illuminated, press down the pump control button “ ” to the lower position to
brew until no descaler is left.
Then brewing coffee (no coffee powder) with tap water in the MAX level, repeat the steps of
4-6 for 3 times (it is not necessary to wait 15 minutes in step of 6), then brewing until no
water is left in the tank.
Repeat the step of 9 at least 3 times to make sure the piping is cleanly.