Commissioning
55
Climate 5000L • Climate 5000iL – 6721841494 (2022/05)
Table 9 Switch positions
Table 10 Set the output
Table 11 Set the network address
Table 12 Definition of DIP Switches
5 Commissioning
5.1 Commissioning checklist
Table 13
Definition of DIP switch 0/1:
Definition 0
Definition 1
ENC1 Code Capacity setting
1)
1) Default depending on the model
020
1 26
2 32 - 35
4 36 - 53
5 54 - 71
7 72 - 90
8 91 - 105
9 109 - 140
A 141 - 160
B 161 - 200
S1 S1 Setting S2 Network address
0 - F 0 - 15
1)
1) Default
0 - F 16 - 31
0 - F 32 - 47
0 - F 48 - 63
DIP switch Definition of DIP Switches
1)
1) Default highlighted in bold
Fan OFF temperature when heating (anti-cold air function)
SW1 • [00]: 0 °
• [01]: 15 °C
• [10]: 8 °C
• [11]: Reserved
Behaviour of the fan once the room target temperature has been
reached
SW2 • [0]: Fan off
• [1]: Fan on (anti-cold air function deactivated)
Auto restart
SW3 • [0]: Automatic restart on
• [1]: Automatic restart off
Set master and slave unit
SW5 • [00]: Master unit only, no slave unit
• [01]: Master unit (heating)
• [10]: Master unit (cooling)
• [11]: Slave unit
Temperature compensation (heating)
SW6 • [00]: 0 °C
• [01]: 2 °C
• [10]: 4 °C
• [11]: Reserved
1 Outdoor unit and indoor units are correctly
installed.
2 Pipes are correctly
•connected,
• thermally insulated,
• and checked for tightness.
3 Electrical connection has been correctly
established.
• Power supply is in the normal range.
• Protective conductor is properly attached.
• Connection cable is securely attached to the
terminal strip.
• Optional external accessories properly
connected and DIP switch correctly set.
• WLAN-Gateway (optional accessories)
Connection is correct and established according
to the Gateway installation instructions.
4 Condensate pump and condensate pipe is properly
installed and tested.
5 All covers are fitted and secured.