EasyManua.ls Logo

Bosch FAS-420-TT Series - Planning for Forced Airflow

Bosch FAS-420-TT Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Aspiration smoke detector LSN improved Planning | en 67
Bosch Sicherheitssysteme GmbH Operation guide 2020.04 | 6.1 | F.01U.029.275
Q - - a 6.0 3.6 2.5 2.5 2.5 2.5 2.5 2.5 2.5
R - - - a 6.0 3.0 2.5 2.5 2.5 2.5 2.5 2.5
S - - - - a 6.0 3.0 2.5 2.5 2.5 2.5 2.5
T - - - - - a 6.0 3.0 2.5 2.5 2.5 2.5
U - - - - - - a 6.0 3.0 2.5 2.5 2.5
V - - - - - - - a 6.0 3.0 2.5 2.5
W - - - - - - - - a 6.0 3.0 2.5
X - - - - - - - - - a 6.0 3.0
Y - - - - - - - - - - a 6.0
Z - - - - - - - - - - - a
a = Acceleration openings = 7.0 mm
Refer to
2. Option: reducing the number of air sampling openings, page 58
4.11 Planning for forced airflow
Monitoring the air-conditioning ducts
Air-conditioning units are broken down into low and high-speed units (see table below). The
details provided in this chapter apply only to low-speed units. There are no adequate empirical
values available for high-speed units. Hence, smoke trials must be executed for air-
conditioning ducts with flow speeds above 10m/s, in order to determine optimal response
behavior.
Air-
conditioning
ducts
Low-speed units High-speed units
Flow speed Maximum 6 to 10 m/s > 10m/s
Duct cross-section Large Small
Difference pressures
along the flow
direction
Low High
The speed distribution in an air-conditioning duct appears as follows:
1
v
1
v
1 >
v
2 >
v
3 >
v
4
v
2
v
3
v
4
Speed distribution in an air-conditioning duct
1 Air-conditioning duct
V
1
-V
4
Flow speed

Table of Contents

Other manuals for Bosch FAS-420-TT Series

Related product manuals