Aspiration smoke detector LSN improved Installation of the pipe system | en 87
Bosch Sicherheitssysteme GmbH Operation guide 2020.04 | 6.1 | F.01U.029.275
Overview of mounting clamps
1 Standard mounting clamps for 25mm pipe
2 Plastic mounting clamps for 25mm pipe,
for length changes and temperatures of up
to ‑40°C
3 Spring steel clamp for 25mm pipe, for
high-rise warehouses and temperatures of
up to ‑40°C
6.2 Air sampling openings
Example of an aspiration boring with aspiration reducing
film sheet
1 Smoke aspiration pipe
2 Aspiration reducing film sheet
with air sampling opening
3 Marking tape for aspiration
reducing film sheet
4 Air sampling opening
5 Fire red (RAL3000)
6 Transparent
Air sampling openings
Select the structure of the air sampling opening (aspiration boring) and the position in the
pipe system according to the project specification and taking into account the planning
guidelines.