EasyManua.ls Logo

Bosch Rexroth ID 40 - Turning on the SLK

Bosch Rexroth ID 40
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28/176 Installing MDT and SLK
Bosch Rexroth AG, MIT: ID 40, 3 842 530 344/2014-05
3.4.4 Turning on the SLK
Once the SLK has been mechanically and electrically installed, the supply voltage
can be switched on. The SLK performs a self-test on start-up (approx. 15 sec.).
During this time, the cover on the HF head illuminates, though the status display
remains inactive. After the self-test, the status display will first show the currently
configured node number for a few seconds, followed by the “ready” signal. The light
on the HF head then turns off. The initial state after power-on is always “off, i.e., the
HF field is off and no communication is possible with the MDT.
Fig. 13: Display showing current node number on a Profibus SLK
Fig. 14: Display showing ready
Fig. 15: Approx. 15 seconds until ready after turning on
PROOF COPY 1 | 20.05.2014 | FOR INTERNAL USE ONLY

Table of Contents

Related product manuals