1 697 090 700 2014-04-10| Robert Bosch GmbH
4 | VLS 5235 | en
Contents
1. Symbols used 5
1.1 In the documentation 5
1.1.1 Warning notices -
Structure and meaning 5
1.1.2 Symbols in this documentation 5
1.2 On the product 5
2. Important notes 6
3. Safety instructions 6
3.1 Mains voltage 6
3.2 Risk of injury, danger of crushing 6
4. Obligations of the plant operator 7
4.1 Operation of lifting platforms 7
4.2 Checking of lifting platforms 7
4.2.1 Scope of checking 7
4.2.2 Regular checking 7
4.2.3 Exceptional checking 7
4.3 Inspection log 8
5. Product Description 8
5.1 Designated use 8
5.2 Floor-mounted and underfloor versions 8
5.3 Authorized users 9
5.4 Preparation by the user 9
5.4.1 Space requirements 9
5.4.2 Foundation and connections 9
5.5 Transportation information 9
5.5.1 Package specification 9
5.5.2 Lifting and handling 9
5.6 Set-up and initial commissioning 9
5.7 Scope of delivery 9
5.8 Special accessories 10
5.9 Important safety note 10
5.10 Warning labels 10
5.11 Noise level 11
5.12 Construction of the lift 11
5.13 Dimension 11
5.14 Safety devices descriptions 11
5.15 Technical data 12
6. Operation 12
6.1 Essential points for operation 12
6.2 Flow chart for operation 13
6.3 Switch-on 13
6.4 Preparation 13
6.5 Driving the vehicle into position 13
6.6 Operation instructions 14
6.6.1 Raise vehicle using the Runways 14
6.6.2 Lower vehicle 14
6.6.3 Raise auxiliary lift 15
6.6.4 Lower Auxiliary lift 15
7. Note on Troubleshooting 16
7.1 Faults during runway operation 16
7.2 Faults during operation of auxiliary lift 16
8. Maintenance 17
8.1 Important notes on maintenance 17
8.2 Cleaning 17
8.3 Maintenance by the user 17
8.3.1 Maintenance agreement 17
8.3.2 Maintenance schedule 18
8.3.3 Regularly lubricate below positions 18
9. Decommissioning 19
9.1 Temporary shutdown 19
9.2 Change of location 19
9.3 Disposal and scrapping 19
9.3.1 Substances hazardous to water 19
9.3.2 VLS 5235 and accessories 19
10. Floor plan 20