EasyManua.ls Logo

Bosch ZBR16-3A Series - 8 Commissioning; Before Operating the Appliance

Bosch ZBR16-3A Series
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning | 51
6 720 806 992 (2015/03)Greenstar
8 Commissioning
Fig. 60 Overview of the controls
[1] Emissions test button
[2] Service button
[3] Burner operation indicator lamp
[4] ON/OFF power switch
[5] Key pad lock
[6] ECO button
[7] Reset button
[8] Display
[9] Automatic air vent (ZWB..-3A combi boilers only)
[10] Boiler water pressure gauge
[11] DHW thermostat
[12] Safety relief valve discharge hose
[13] Condensate drain hose
[14] Heating return pipe
[15] Cold water pipe (ZWB..-3A combi boilers only)
[16] Gas pipe
[17] DHW pipe (ZWB..-3A combi boilers only)
[18] Supply pipe
[19] Boiler high limit dial
8.1 Before operating the appliance
Adjust the expansion vessel pre-charge pressure to the static head of
the heating system ( page 33).
Open radiator and zone valves (as applicable).
Open heating supply and return valves, fill heating system to 14.5 to
21.75 psi (1 - 1.5 bar) and close fill valve.
Bleed all air from the system.
If the boiler water pressure has dropped, fill the heating system again
to 14.5 to 21.75 psi (1 to 1.5 bar).
On ZBR..-3A appliances (heating boilers) with a DHW tank, open the
cold water supply and open a DHW tap until water runs out.
Verify that the gas type specified on the rating plate is the same as the
gas type used.
Open the gas cock.
eco
reset
1
2
3
4
5
6
7
8
9
11
10
12
13
151618
19
14
6 720 641 933-25.1O
17
NOTICE: Commissioning without being properly filled
and purged will damage the appliance.
Only operate this appliance after ensuring there is
sufficient water in the boiler and the system.

Table of Contents

Related product manuals