EasyManua.ls Logo

Boss MX1-3E - User Manual

Boss MX1-3E
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Operation &
Maintenance Manual
BOSS Digital Pressurisation Equipment
AX Models (AX1-2.5E, AX2-2.5E, AX1-5E, AX2-5E)
PF Models (PF1-2.5E, PF2-2.5E, PF1-5E, PF2-5E)
Midi Models (MD1-2.5E, MD2-2.5E, MD1-5E, MD2-5E)
Digifiller (Digifiller 0.5, Digifiller 1.0, Digifiller 1.5, Digifiller 2.0)
Mini Models (MX1-3E, MX2-3E)

Questions and Answers

Summary

Installation

AX Skid Clearance and Connection Requirements

Pressfill (PF) Clearance and Connection Requirements

Digifiller & Midi (MD) Clearance and Connection Requirements

Mini (MX) Clearance and Connection Requirements

Electrical Power Supply

Commissioning

Pre-Commissioning Checklist

Lists essential conditions to verify before starting the commissioning process.

Controller Overview

Controller Programming

Menu Items Explained

Hydraulic Commissioning

Initial Start-up

Testing

Operation

Fault Codes

Lists and explains all fault codes displayed on the digital controller.

Troubleshooting

Low Pressure Faults

Identifies causes and solutions for low pressure fault indications.

High Pressure Faults

Identifies causes and solutions for high pressure fault indications.

Flood Limit Faults

Identifies causes and solutions for pump flood limit fault indications.

Pump Fail Faults

Identifies causes and solutions for pump fail fault indications.

Low;High Water Faults

Identifies causes and solutions for low or high water level faults.

Maintenance

Check Expansion Vessel Pre-Charge

Procedure for checking and maintaining the expansion vessel's pre-charge pressure.

Wiring Diagram

Summary

Installation

AX Skid Clearance and Connection Requirements

Pressfill (PF) Clearance and Connection Requirements

Digifiller & Midi (MD) Clearance and Connection Requirements

Mini (MX) Clearance and Connection Requirements

Electrical Power Supply

Commissioning

Pre-Commissioning Checklist

Lists essential conditions to verify before starting the commissioning process.

Controller Overview

Controller Programming

Menu Items Explained

Hydraulic Commissioning

Initial Start-up

Testing

Operation

Fault Codes

Lists and explains all fault codes displayed on the digital controller.

Troubleshooting

Low Pressure Faults

Identifies causes and solutions for low pressure fault indications.

High Pressure Faults

Identifies causes and solutions for high pressure fault indications.

Flood Limit Faults

Identifies causes and solutions for pump flood limit fault indications.

Pump Fail Faults

Identifies causes and solutions for pump fail fault indications.

Low;High Water Faults

Identifies causes and solutions for low or high water level faults.

Maintenance

Check Expansion Vessel Pre-Charge

Procedure for checking and maintaining the expansion vessel's pre-charge pressure.

Wiring Diagram

Boss MX1-3E Specifications

General IconGeneral
CategoryIndustrial Equipment
Operating Temperature-20°C to +70°C
Protection ClassIP20
Dimensions99 x 97 x 30 mm
Weight250g