63
P12 /P15 /P18
9. Control System and Programs 9.
9.2. Program Sequences (Extract)
9.2
Machine P12/P15/P18 P 01 P 02 P 03 P 04 P 05 P 06 P 07 P 08
Pump tank to tank 00:10 00:10 00:40 00:40 00:10 00:10
Pump up from tank 1 01:30 01:30 01:30 00:30 01:30 01:30
Pump up from tank 2 01:00 00:30 01:30
Pump circuit 02:00 02:00 02:00 02:00 02:00
Spin to distillation 01:45 01:45 01:45 01:45 03:45
Pump to distillation 00:30 00:30 00:30 00:30
Pump up from tank 1 01:30 01:30
Pump up from tank 2 01:00 01:00 02:30 01:15*
Filtration 05:00 05:00 05:00 05:00 05:00
Pump circuit 03.00*
03.00*
03.00*
03.00*
03.00*
03:00
Pump to tank 1 01:30 00:30 01:30 01:30 00:30
Pump to tank 2
Pump to distillation 00:30
Spin to tank 1 03:45 03:45
Spin to tank 2
Spin to distillation 03:45 02:45 03:45 03:45
Pump to tank 1 00:30 00:30
Pump to tank 2
Pump to distillation 00:30 00:30 00:30 00:30
Pump up from tank 2 01:15
Pump circuit 02:00
Pump to tank 1 00:15
Pump to distillation
Spin to tank 1 03:45
Spin to distillation
Pump to tank 1 00:30
Tumble 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30
Spray XX XX
Tumble 04:00 04:00
Predrying without heat: 03:00 03:00 03:00 03:00
Dry, cage outlet
50°C/122°F
Dry, cage inlet: 65°C
/149°F ***
12:00 12:00 12:00 09:00 09:00 12:00 14:00 14:00
Drying time controller X X X X X X X X
Reduction** from
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
Reduction with Slimsorba 03:00 03:00 03:00 03:00 03:00 03:00 03:00 03:00
Adsorption (only with
Slimsorba)
06:00 06:00 06:00 06:00 06:00 06:00 06:00 06:00
See next page for key to table