EasyManua.ls Logo

Bradco 617 - Page 46

Default Icon
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING INSTRUCTIONS
CONTROLS
617 TRENCHER
G
G
5787
2-23-92
This procedure must be done simultaneously to both adjusting bolts to
prevent the boom from becoming wedged onto its mount.
CAUTION! Never work on, or make adjustments to any part of the tren-
cher while the unit is running. You could get caught in the
digging teeth which could cause severe injury or death.
It is common for your trencher to need its digging chain tightened
after the first 10 to 20 minutes of operation as the chain and sprocket seat
themselves.