EasyManua.ls Logo

BRAMIDAN B3 - Electrical Connection and Earthing

BRAMIDAN B3
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Installation USA.fm • Page 13Baler
The working area must be tidy and free of waste and similar.
Connection:
Before the baler is connected to the supply network, check whether the electric motor is single or
three phase. This appears on the nameplate on the baler. If the motor is single phase, it will say,
for example 1
x230 Volt under "Supply", and if the motor is three phase, it will say, for example,
3
x400 Volt.
The voltage of the supply network must be appropriate for the configuration of the baler.
Important!
The electrical earthing in the machine must be used and is connected to the fixed installation.
Single phase motor with socket:
Before connecting the baler you must visually ensure that the supply network looks secure, and
that there are no defects, loose parts, etc.
The socket replaces the repair switch in accordance with applicable rules. Therefore, there must
always be easy access to the socket, so the power can be interrupted again.
3
7
1
5
-
2
2
9
D
Industrivej 69
DK-6740 Bramming
Tel. +45 75 173266
www.bramidan.com
kW
Volt
Amp
dB
Lbs
:
:
:
:
:
:
No.
Model
Year
:
:
:
CAUTION
CAUTION