Preparation
Installation
Before performing any generator maintenance, always
perform the following steps:
1 Set the generator’s circuit breaker to its OFF
position.
2 Press and hold the control panel OFF button.
3 Remove 15 Amp fuse from control panel.
4 Utility voltage is present at generator control
panel. Disconnect power before servicing control
panel by removing the fuses from the transfer
switch.
1 Remove the five screws and roof.
2 Assemble antenna piece to base.
3 Install grommet on antenna wire.
4 Insert grommet and wire into slot on rear panel.
5 Attach antenna (temporarily) onto the back panel.
3
1
2
3
4
1
2
4
3
5
en