Page 2 BRIGON 500 NT
Contents:
Product description 3
View of the plug connections 3
Commissioning, handling, storage 4
Important Safety Instructions 4
Definitions and instructions 5
Rotary switch 5
Common symbols and abbreviations 5
Recommendations for measuring 6
Operation 7
Rotary switch position Menu 9
Menu Setup 9
Menu Pressure (tightness test) 9
Menu Report 9
Menu SCREEN 10
Menu SERVICE 10
Rotary switch position Status 10
Rotary switch position AUX 10
Rotary switch position O
2
/Eff (stack loss/efficiency) 11
Rotary switch position CO/CO
2
11
Rotary switch position p (Pressure/Differential pressure) 11
Rotary switch position ±∆p (Tightness test) 11
Rotary switch position ∆T (differential temperature) 12
Rotary switch position ext.CO (CO in ambient air) 12
Additional function MANOMETER 12
Calibration 13
Stack loss measurement / Mid-stream search 13
Pressure/Draught, Differential pressure measurement 14
Maintenance and Service 14
Battery, power supply 14
Water trap and particle filter 15
CO
2
- and CO sensor 15
What to do, if... 15
Technical data 18
NOTES 19
Disposal 20