EasyManua.ls Logo

Bristan GLE385 W User Manual

Bristan GLE385 W
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Models Covered:
GLE385 W, GLE385 B,
GLE395 W, GLE395 B,
GLE3105 W, GLE3105 B
Please keep this booklet for future
reference.
Installer, when you have read these
instructions please ensure you leave
them with the user.
Installation Instructions
and User Guide
Glee Electric Showers

Questions and Answers:

Bristan GLE385 W Specifications

General IconGeneral
Maximum Static Pressure10 bar
Maximum Inlet Temperature80°C
FinishChrome
MaterialBrass
Handle TypeLever
Hot and Cold WaterYes
Ceramic Disc ValvesYes
Inlet Connection15mm
Outlet ConnectionG 1/2 in
Water InletHot and Cold
Warranty5 Year

Summary

Important Safety Information

Freezing, Ventilation, and Operational Safety

Covers warnings about freezing conditions, inadequate ventilation, damaged parts, blockages, and hose damage.

Child Safety and Usage Precautions

Covers warnings for children and persons with reduced capabilities, and general usage safety.

Important Safety Information

Electrical Connection and Isolation Safety

Covers switching off power, earth continuity, isolation switches, and mounting surfaces.

Installation and Maintenance Safety

Covers installation constraints, modification warnings, shower head compatibility, and descaling.

Product Features

Control Interface and Display

Covers temperature indication, stop/start button, power, and temperature controls.

Operational Indicators and Modes

Describes warm-up, phased shut down, and performance maintenance indicators.

Product Specifications

Plumbing and Electrical Connections

Details inlet, outlet, and cable entry points for the shower unit.

Operational Requirements and Usage

Covers pressures, temperatures, system needs, and recommended usage types.

Electrical Requirements and Safety

Installation and Wiring Regulations

Covers earthing, wiring regulations, supply voltage, and independent circuits.

Connection Procedures and Components

Details cable requirements, isolating switches, and voltage drop considerations.

Circuit Protection and Cable Capacity

Protection Devices and Ratings

Covers RCD, MCB, fuse requirements, and relevant tables.

Cable Selection and Installation Checks

Covers cable capacity, impedance, fuse board rating, and final installation checks.

Water Requirements and Regulations

Installation and Regulatory Compliance

Covers water regulations, outlet placement, backflow prevention, and scale inhibitors.

Pressure, Flow, and Hose Constraints

Details pressure, flow rates, PRVs, and hose retainer requirements.

Mounting the Shower Unit

Wall Preparation and Fixing

Covers checking for pipes, wall surface, levelling, marking, drilling, and fixing.

Installation Tips and Constraints

Includes warnings, advice on positioning, and avoiding recessing the unit.

Plumbing Connections

Inlet Entry Point Options

Details the various ways the water inlet can be connected to the unit.

Plumbing Connections

Inlet and Outlet Connection Details

Covers inlet entry options, pipe types, stop valves, and outlet safety.

Plumbing Connections and PRD

Water Inlet Connection and PRD

Details the push-fit water connection and the function/warnings of the Pressure Relief Device.

Electrical Connections

Cable Entry and Safety Requirements

Covers earthing, wiring regulations, and various cable entry point options.

Electrical Connections

Cable Routing and Entry Details

Details continued cable entry options and internal routing tips.

Final Electrical Connections and Settings

Terminal Connections and Safety Checks

Covers switching off power, connecting terminals, tightening, and sleeving.

Cover Fitting and Initial Control Settings

Details fitting the cover, connecting internally, and setting initial control knob positions.

Riser Rail Installation

Rail Mounting and Bracket Fixing

Covers identifying parts, positioning the rail, drilling, fixing brackets, and levelling.

Hose and Slider Assembly

Details fitting the hose, slider, and related notes.

Commissioning and System Testing

Initial Flush and Water Flow Test

Covers removing the showerhead, flushing the system, and testing water flow and tightness.

Post-Flush Checks and Indicators

Details cleaning filters, handling low pressure indicators, and reassembling the showerhead.

Operating the Shower

Start, Stop, and Temperature Controls

Covers starting/stopping, phased shut down, and control panel functions.

Operating the Shower

Showerhead Spray Pattern Adjustment

Covers spray modes and considerations for winter use.

Maintenance Procedures

General Cleaning and Performance Indicators

Covers general cleaning, performance indicators, and advice.

Maintenance Procedures

Filter Cleaning

Details cleaning the inlet filter and outlet hose mesh filter.

Troubleshooting Guide

Common Issues and Resolutions

Provides a table of symptoms, causes, and actions for common problems.

Guarantee and Service Information

Guarantee Terms and Conditions

Details the 2-year parts and 1-year labour guarantee, conditions, and validity.

Service Policy and Replacement Parts

Explains how to handle malfunctions, service calls, and obtaining spare parts.

Spare Parts List

Component Identification and Ordering

Details the parts list, diagram, and how to find spare parts online.

Spare Parts Visual Guide

Illustrated Component Breakdown

Shows images of individual spare parts corresponding to the parts list.

Spare Parts: Riser Rail Assembly

Riser Rail Components and List

Provides a diagram and list of spare parts for the riser rail assembly.

Installation Notes

User and Installer Notes Area

Provides space for custom notes regarding installation.

Company and Contact Information

Bristan Contact and Warranty Details

Provides company address, website, email, and links to guarantee terms.

Related product manuals