EasyManuals Logo

BRP ROTAX 916 i A Series Maintenance Manual

BRP ROTAX 916 i A Series
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #77 background imageLoading...
Page #77 background image
BRP-Rotax
MAINTENANCE MANUAL LINE
Step
Procedure
5
Disassemble overload clutch and damper clutch. See Chapter 72-10-00
Maintenance Manual Heavy (MMH).
6
Check all given wear limits about the gearbox assy. See Chapter 72-10-
00 Maintenance Manual Heavy (MMH) section “Inspection” and “Wear
Limits”.
7
If a part is not within given limits or has unusual wear or damage, the
part needs to be replaced.
NOTICE
All gaskets, O-rings and oil seals must be replaced!
Step
Procedure
8
Assemble gearbox. See Chapter 72-10-00 Maintenance Manual Heavy
(MMH) section “Assembly”.
NOTE
Next steps need a valid iRMT training level for all tasks required by the Mainte-
nance Manual Line (MML).
Step
Procedure
1 Re-install drive gear in accordance with Chapter 05-50-00, section “In-
stallation of propeller gearbox” and check the crankshaft for out of
roundness. See Chapter 72-10-00 Maintenance Manual Heavy (MMH).
2
For installation of the gearbox, see Chapter 05-50-00, section “Installa-
tion of propeller gearbox”.
3
Perform an engine test run in accordance with Chapter 12-20–00, sec-
tion “Test run of engine”.
4 Release the engine back to service and make an entry in the engine log-
book detailing the work carried out.
Effectivity: 916 i A / C24
Edition 0/Rev. 1
05–50–00
Page 11
December 01 2023

Other manuals for BRP ROTAX 916 i A Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BRP ROTAX 916 i A Series and is the answer not in the manual?

BRP ROTAX 916 i A Series Specifications

General IconGeneral
BrandBRP
ModelROTAX 916 i A Series
CategoryEngine
LanguageEnglish

Related product manuals