EasyManua.ls Logo

BRP ROTAX 916 i A Series - Engine Components

BRP ROTAX 916 i A Series
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRP-Rotax
MAINTENANCE MANUAL LINE
Step
Procedure
5
Disassemble overload clutch and damper clutch. See Chapter 72-10-00
Maintenance Manual Heavy (MMH).
6
Check all given wear limits about the gearbox assy. See Chapter 72-10-
00 Maintenance Manual Heavy (MMH) section “Inspection” and “Wear
Limits”.
7
If a part is not within given limits or has unusual wear or damage, the
part needs to be replaced.
NOTICE
All gaskets, O-rings and oil seals must be replaced!
Step
Procedure
8
Assemble gearbox. See Chapter 72-10-00 Maintenance Manual Heavy
(MMH) section “Assembly”.
NOTE
Next steps need a valid iRMT training level for all tasks required by the Mainte-
nance Manual Line (MML).
Step
Procedure
1 Re-install drive gear in accordance with Chapter 05-50-00, section “In-
stallation of propeller gearbox” and check the crankshaft for out of
roundness. See Chapter 72-10-00 Maintenance Manual Heavy (MMH).
2
For installation of the gearbox, see Chapter 05-50-00, section “Installa-
tion of propeller gearbox”.
3
Perform an engine test run in accordance with Chapter 12-20–00, sec-
tion “Test run of engine”.
4 Release the engine back to service and make an entry in the engine log-
book detailing the work carried out.
Effectivity: 916 i A / C24
Edition 0/Rev. 1
05–50–00
Page 11
December 01 2023

Other manuals for BRP ROTAX 916 i A Series

Related product manuals