EasyManua.ls Logo

Bryant 246 - FIRING BOILER AND CONTROL ADJUSTMENT; Lighting D4 and D6 Pilots; Lighting D2 and D5 D5 Pilots

Bryant 246
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SEP/04/2008/THU
09:18
AM
UTC
TECH
PUB
More
generally
used
id
a
vent
system.
as
shown
in
Figure
32.
Using
the
draft
hood
vent
opening
sizes
shown
in
the
boiler
installation
instructions,
this
system
will
work
properly
if
a
minimum
vertical
rise
of
4
feet
above
the
draft
hood
can
be
maintained.
This
is
assuming
that
the
chimney
is
of
adequate
size
and
also
that
adequate
-combustion
air
is
available.
Further,
the
outlet
end
of
the
horizontal
collector
should
be
no
more
than
6
feet
from
the
chimney
and
should
have
no
more
than
one
90°
elbow
in
this
six-
foot
fun.
i
Practical
application
in
many
cases,
however,
will
not
allow
adequate
rise
4
feet
above
the
boiler
draft
hood,
and
this
is
the
installation
Where
trouble
oc¬
casionally
develops^
As
this
minimum
of
4
feet
is
reduced,
the.
ability
of
these
risers
to
create
a.
natural
:
,v
draft
is
reduced.
This
initial
energy
source
is
quite
im-
S":
.{portaht,
When
it
is
not
available,
certain
steps
can
be
Lyf
taken
to
provide
proper
venting.
For
each
foot
of
riser
;
reduction,
enlarge
the
horizontal
collector,
diameter
one-inch,
This
will
reduce
the
resistance
of
the
system,
and
if
the
chimney
is
.
adequate;.
the.
unit
should
--properly
vent.
:y
•/
.
f.F
•'
}
|.
'
:
l
"
In
certain
cases
where
short
risers,
less
than.
4
feet
!
'
v
>vy-
;
high
are
a
necessity
due'to/overhead
obstructions,
spillage
of
combustion
products
has
beep
noted
at
the
i
\v-
di'aft
hoods
farthest^hmim
the"chimneyrOnce^ag-a'inr
pT'T
;
assuming
the
chimney
ia
adequate,
an
acceptable
i
m
ethod
of
correction
is
to
.permanently
baffle
the
ly-'"
■■■■
riser(s)
closest
to
the
chimney
to
reduce
the
excess
of
Iv-ir
room
air
entering
those
draft
hoods,
DO
NOT
BAF-
FLE
ENOUGH
TO
CAUSE
SPILLAGE.
The
fixed
baffles
in
the
short
risers
above
the
boiler
draft
hood
are
acceptable
as
spelled
out
in
Gas
Appliances
Gas
Piping
Z
21.30.
Size
of
Vent
Connectors,
and
.Dampers.
These
baffles
can
he
fabricated
from
20-gauge
steel
such
as
shown
in
Figure
33.
They
should
he
per¬
manently
attached
to
the
inside
of
the
riser(s).
Trial
and
error
will
dictate
the
degree
to
which
each
should
be
positioned
to
avoid
draft
hood
spillage
at
the
far
end
of
the
boiler.
Be
sure
not
to
bend
the
fixed
baffle
FAX
No.
317
240
5662
P.
016/018
so
it
will
obstruct
the
flue
gas
flow
in
the
horizontal
collector.
^
ENLARGE
Baffle
Size
(Inches)
A55443
R
;
CO
9
10
'
A
''
6
7
8
Shown
is
suggested
ewe
of
fixed
baffle
for
different
size
-rioers..
A",
....
-Figure
33
,.
f
"
,
FIRING
BOILER
AND
i
CONTROL
ADJUSTMENT
After
completing
all
gas
and
flue
connections
and
water
piping,
the
boiler
is
ready
for
operation;and
ad¬
justments.
••.
.
.
.
:
/
7*
■■
"M
Before
Lighting.(all
gases)'
1.
Make
certain
that
boiler
is
-properly
filled
with
water.
-:
".'-'l;;
.
LyS'L-
2-
Open
all
valves
in
supply
and
return
mains
of
heat¬
ing
System,
-
'
:
:
■■
3.
Set
thermostat,
or
operating
control
below
normal
setting.
4,
Close
main
manual
gas
shutoff-valve
and
manual
pilot
gas
Shutoff
valve
for
5
minutes
before
lighting
pilots,
Lighting
D4/and
DC
Pilots:
1,
Open
manual
pilot
gas
shutoff
valve
and
allow
time
for.
air
to
.purge
from
line,
2,
Light
pilot(s)
with
a
match
or
taper
soon
as
air
is
purged
2
7
1
!
L.
:
'
•<
J
r
i,
Lighting
D2
and
D5
Pilots;.
1.
Open
manual
pilot
gas
shutoff,
valve,
.
....
,2.
Depress
red
button
on.
.1.00%
pilot
shutoff
valve
and
allow
time
for
air
to
purge.
3,
Light
all
pilots
soon
as
air
is
purged,
_4.
Keep
red,
b
utton
depressed
until
nilot
flame
is
stable,
r...
...
.
.;•
.
i'j.r
f
Gas
Pressure
Regulator
The
adjustable,
spring-loaded
gas
regulator
ensures
a
constant
gas
pressure
to
the
burners
during
main
line
gas
pressure
fluctuations.
It
is
adjusted
at
the
factory
to
deliver
an
outlet
pressure
of
approximately
3
inches
wc,
assuming
a
range
of
inlet
pressures
up
to
15
inches
wc-
While-.the
boiler
is
-in
operation,
check
the
gas
input
at
the
meter.
The
burners
are
equipped
with
fixed
orifices
sized
to
produce
the
rated
input
shown
on
the
rating
plate.
Determine
the
gas
input
by
following
the
method
in
Bryant
form
“Installation
Procedures
for
Gas
Appliances.”
If
the
measured
and
rated
input
are
not
the
same,
the
:'v'-sy-.'
if,
.Sf*'
|
t
-
1
6
-

Related product manuals