EasyManua.ls Logo

Bryant 353BAV - Non-Direct Vent Installation Checklist; CHECKLIST - NON DIRECT VENT (1-PIPE) INSTALLATION; CHECKLIST-START-UP; Safety Controls Check Operation

Bryant 353BAV
62 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62
CHECKLIST -- NON DIRECT VENT (1-PIPE) INSTALLATION
LOAD CALCULATION
____________ Heating Load (Btuh)
____________ Cooling Load (Btuh)
____________ Furnace Model Selection
VENT PIPING
Termination Location
____________ Roof or Sidewall
____________ Vent Pipe Length
____________ Vent Pipe Elbow Quantity
____________ Pipe Diameter Determ ined from Sizing Table
____________ Pipe Sloped To Furnace
Pipe Insulation
____________ Over Ceilings
____________ Low-Ambient Exposed Pipes
Condensate Drain
____________ Unit Level or Pitched Forward
____________ Internal Tubing Connections
Free of Kinks and Traps
____________ External Drain Connection Leak Tight and
Sloped
____________ Condensate Trap Primed before Start-Up
____________ Heat Tape Installed if Required
CHECKLIST—START-UP
____________ Gas Input Rate
(Set Within 2 percent of Rating Plate)
____________ Temperature Rise Adjusted
Thermostat Anticipator
____________ Anticipator Setting Adjusted or
____________ Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
____________ Primary Limit
____________ Pressure Switch
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
E2010 Bryant Heating & C ooling Systems D 7310 W. Morris St. D Indianap olis, IN 46231 Printed in U.S.A. Edition Date: 11/10
Replaces: II353BAV--- 01
Catalog No. II353BA
V
--- 0 2
353BAV

Related product manuals