EasyManua.ls Logo

Bryant 355AAV - Direct Vent (2-PIPE) INSTALLATION CHECKLIST

Bryant 355AAV
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
CHECKLIST DIRECT VENT (2---PIPE) INSTALLATION
LOAD CALCULATION
________________ Heating Load (Btuh) Condensate Drain
________________ Cooling Load (Btuh) ________________ Unit Level or Pitched Forward
________________
Furnace Model Selection
________________ Internal Tubing Connections
Free of Kinks and Traps
COMBUSTION AND VENT PIPING
________________ External Drain Connection Leak
Tight and Sloped
Termination Location
________________ Condensate Trap Primed before
S t a r t --- U p
________________ Roof or Sidewall Heat Tape Installed if Required
________________ Termination Kit --- 2 Pipe or Con-
centric
C H E C K L I S T --- S T A R T --- U P
________________
C o m b u s t i o n --- A ir P i p e L e n g t h
________________ Gas Input Rate (Set Within 2
percent of Rating Plate)
________________ Combustion---Air Pipe Elbow
Quantity
________________
TemperatureRiseAdjusted
________________ Vent Pipe Length Thermostat Anticipator
________________ Vent Pipe Elbow Quantity ________________ Anticipator Setting Adjusted or
________________ Pipe Diameter Determined from
Sizing Table
________________ Cycle Rate (3 Cycles per Hr)
Selected
________________ Pipe Sloped To Furnace Safety Controls Check Operation
P i p e I n s u l a t i o n C H E C K L I S T --- S T A R T --- U P
________________
Over Ceilings
________________ Gas Input Rate (Set Within 2
percent of Rating Plate)
________________ Low--- Ambient Exposed Pipes ________________ Temperature Rise Adjusted
Thermostat Anticipator
________________ Anticipator Setting Adjusted or
________________ Cycle Rate (3 Cycles per Hr)
Selected
Safety Controls Check Operation
________________ Primary Limit
________________ Pressure Switches
355A

Related product manuals