EasyManua.ls Logo

Bryant 355MAV - Checklist

Bryant 355MAV
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHECKLIST—INSTALLATION
Load Calculation Condensate Drain
_______
_______
_______
Heating Load (Btuh)
Cooling Load (Btuh)
Furnace Model Selection
_______
_______
_______
_______
_______
Unit Level or Pitched Forward
Internal Tubing Connections Freeof Kinks and Traps
External Drain Connection Leak tight and Sloped
Condensate Trap Primed before Start-Up
Heat Tape Installed if Required
COMBUSTION AND VENT PIPING
Terminal Location
CHECKLIST—START-UP
_______
_______
______
______
______
______
______
______
Roof or Sidewall
Termination Kit 2 Pipe or Concentric
Combustion-Air Pipe Length
Combustion-Air Elbow Quantity
Vent Pipe Elbow Quantity
Pipe Diameter Determined from
Sizing Table
Pipe Sloped to Furnace
______
______
Gas Input Rate(Set Within 2 percent of RatingPlate)
Temperature Rise Adjusted
Pipe Insulation Thermostat Anticipator
______
______
Over Ceilings
Low-Ambient Exposed Pipes
______
______
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)Selected
Safety Controls Check Operaton
______
______
Primary Limit
Pressure Switch
—59—

Table of Contents

Other manuals for Bryant 355MAV

Related product manuals