N-BSSALT V3.0 27 / 57
ISOCYANURIC ACID (mg/l)
--
<75
OZONE (GLASS) (mg/l)
--
0
OZONE (before)
0.4
--
TURBIDITY (NTU)
--
<1
OXIDES (mg/l)
--
<3
NITRATES (mg/l)
--
<20
AMMONIA (mg/l)
--
<0.3
IRON (mg/l)
--
<0.3
COPPER (mg/l)
--
<1.5
ALKALINITY (mg/l)
100
160
CONDUCTIVITY (us/cm)
--
<1700
TDS (mg/l)
--
<1000
HARDNESS (mg/l)
150
250
3- INSTALLATION OF THE EQUIPMENT
3.1- General considerations:
• Place the chlorine cell in a vertical position with electrical connections facing
upwards. If this is not possible, it can be assembled in a horizontal position,
ensuring that the small auxiliary electrode faces upwards.
• Place the chlorination cell in the highest position possible of the purification
circuit and always after the filter.
• If possible, it is recommended to install the cell with a by-pass system with
its corresponding shut-off valves. This is to facilitate maintenance of the cell.