5 | Installation BÜCHI Labortechnik AG
20/38 Operation Manual Inert Loop B-295 SE
u Remove the foil from the oxygen sensor.
u Install the new oxygen sensor.
u Connect the sensor cable.
u Calibrate the sensor. See Chapter8.1 "Cali-
brating the oxygen analyzer", page29
u Install the grounding cable.
u Install the front cover
5.5 Connecting the Inert Loop B-295 SE with a spray drying system
u Connect the communication cable to the spray
dryer.
Connection at the spray dryer see related opera-
tion manual.