b. Attach transformer/control center to junction
box.
F. EP-CSD-1 Control System
Install Gas Control System. All components are
located in Combination Boiler Parts and Control Carton.
1. Install Gas Control Assembly on Manifold. See
Figure 19.
2. Install pilot burner piping and controls. See Figure
19.
3. Install Ignition Transformer.
a. Attach Ignition Transformer to Jacket Vestibule
Panel using four (4) #8 x ½" lg. sheet metal
screws.
b. Connect Ignition Lead from Pilot to Ignition
Transformer.
4. Mount Transformer (continuous circulation) or
Control Center (intermittent circulation) to Junction
Box.
a. Canada only - loop 4" nylon cable tie between
junction box and transformer/control center.
b. Attach transformer/control center to junction
box.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Burnham 8B Series and is the answer not in the manual?

Burnham 8B Series Specifications

General IconGeneral
BrandBurnham
Model8B Series
CategoryBoiler
LanguageEnglish

Related product manuals