EasyManuals Logo
Home>Burnham>Boiler>8H Series

Burnham 8H Series User Manual

Burnham 8H Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
16
F. EP-CSD-1 Control System
Install Gas Control System. All components are
located in Combination Boiler Parts and Control
Carton.
1. Install Gas Control Assembly on Manifold. See
Figure 17.
2. Install pilot burner piping and controls. See Figure
17.
3. Install Ignition Transformer.
a. Attach Ignition Transformer to Jacket Vestibule
Panel using four (4) #8 x ½” lg. sheet metal
screws.
b. Connect Ignition Lead from Pilot to Ignition
Transformer.
4. Mount Transformer (continuous circulation) or
Control Center (intermittent circulation) to Junction
Box.
a. Canada only - loop 4” nylon cable tie between
junction box and transformer/control center.
b. Attach transformer/control center to junction
box.

Other manuals for Burnham 8H Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Burnham 8H Series and is the answer not in the manual?

Burnham 8H Series Specifications

General IconGeneral
BrandBurnham
Model8H Series
CategoryBoiler
LanguageEnglish

Related product manuals