User-Supplied items
Bring the following tools and materials to the installation site, as required:
Materials
An Ethernet cable up to 100 m in length (for a wired uplink to the RG)
Silicone sealant/caulk; for sealing cable entry holes
(2) mounting screws for wall-mount bracket
PoE power supply equipment (PSE)/PoE injector, to install nearby; only if using PoE
power option
Tools
Bring the following tools to the installation site:
Phillips head screwdrivers (#2 head, #1 head)
Level for aligning the installed bracket to the wall or pole
Pencil (to mark bracket and drill hole locations; wall-mount kit)
Nut driver, 5/16" (to tighten hose clamps; pole-mount kit)