EasyManua.ls Logo

Calix GigaSpire BLAST u4hm - Page 18

Calix GigaSpire BLAST u4hm
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
May, 2023.
User-Supplied items
Bring the following tools and materials to the installation site, as required:
Materials
An Ethernet cable up to 100 m in length (for a wired uplink to the RG)
Silicone sealant/caulk; for sealing cable entry holes
(2) mounting screws for wall-mount bracket
PoE power supply equipment (PSE)/PoE injector, to install nearby; only if using PoE
power option
Tools
Bring the following tools to the installation site:
Phillips head screwdrivers (#2 head, #1 head)
Level for aligning the installed bracket to the wall or pole
Pencil (to mark bracket and drill hole locations; wall-mount kit)
Nut driver, 5/16" (to tighten hose clamps; pole-mount kit)

Related product manuals