EasyManuals Logo

CAME BXV04ALS User Manual

CAME BXV04ALS
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
p. 11 - Manual FA01442-EN - 12/2019 - © CAME S.p.A. - The contents of this manual may be changed, at any time, and without notice. - Original instructions
Insert the screws supplied in the anchoring plate.
Lock the screws in place with the nuts supplied.
Remove the pre-shaped clamps using a screwdriver.
Fit the anchoring plate in the iron cage.
The tubes must pass through the existing holes.
UNI 5734
Ø 12
UNI 5588 M12
Position the anchoring plate, taking note of the measurements shown in the drawing.
If the gate does not have a rack, proceed with the installation.
See the section “FASTENING THE RACK”.
Cast cement into the foundation frame.
The plate must be perfectly level and the screw threads completely above surface.
Wait at least 24 hours for the cement to dry.
95
106
Remove the foundation frame.
Fill the hole with soil around the concrete block.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CAME BXV04ALS and is the answer not in the manual?

CAME BXV04ALS Specifications

General IconGeneral
BrandCAME
ModelBXV04ALS
CategoryGate Opener
LanguageEnglish

Related product manuals