EasyManua.ls Logo

CAME BXV04RGS User Manual

CAME BXV04RGS
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Sliding-gate operators
BXV04AGS BXV06AGS BXV08AGS
BXV10AGS BXV04RGS BXV06RGS
BXV08RGS BXV10RGS BXV06AGM
BXV10AGM BXV04ALS BXV06ALS
BXV08ALS BXV10ALS
INSTALLATION MANUAL
FA01442-EN
EN
English

Questions and Answers:

CAME BXV04RGS Specifications

General IconGeneral
BrandCAME
ModelBXV04RGS
CategoryGate Opener
LanguageEnglish

Summary

General Precautions for Installers

Important Safety Instructions

Crucial safety advice for installers to prevent serious bodily harm.

Installer Precautions Summary

Detailed guidelines for safe and compliant installation procedures.

Main Points of Danger for People

Safety Warnings

Highlights potential hazards like entrapment and trapping during operation.

Control Board Details

Terminal and Connector Descriptions

Detailed explanation of control board terminals and connectors.

Programming Button Functions

Explanation of how to use the programming buttons on the control board.

Installation Guide

Preliminary Installation Steps

Essential preparatory tasks before commencing the main installation.

Laying the Anchoring Plate

Step-by-step guide for preparing and installing the foundation anchoring plate.

Operator Setup and Adjustment

Setting Up the Operator

Instructions for placing and connecting the operator onto the base.

Rack and Pinion Installation

Fastening the Gate Rack

Method for securely attaching the rack to the gate leaf.

Adjusting Pinion-Rack Coupling

How to set the correct meshing between the operator pinion and gate rack.

Final Operator Securing and Limit Switches

Fastening Operator in Place

Securing the operator to the anchoring plate after adjustments.

Mechanical Limit Switch Setup

Installing and adjusting mechanical limit switches for travel control.

Magnetic Limit Switch Setup

Establishing Limit Switch Points

Procedures for setting magnetic limit switch positions for gate travel.

Electrical Connections

Passing Electrical Cables

Guidelines for routing cables safely and compliantly.

Power Supply Connections

Instructions for connecting the main power supply to the operator.

Command and Control Devices

Safety Devices

Delta Photocell Connections

Wiring diagrams for Delta photocell safety devices.

Photocell and Sensitive Edge Connections

DIR / DELTA-S Photocell Wiring

Wiring configurations for DIR and DELTA-S photocell systems.

Programming Operations

Programming Button Functions

Explanation of the ESC, <>, and ENTER buttons for programming.

Programming Functions (Part 1)

Safety Devices Test

Procedure to test the functionality of connected safety devices.

Programming Functions (Part 2)

Advanced Programming

Master-Slave Configuration

Sharing parameters between master and slave operators.

User and Gate Configuration

System Settings and Calibration

Motor and Travel Calibration

Setting motor type and performing travel self-learning.

Data Import and Export

Error Messages and Final Operations

Error Code Reference

List and explanation of error codes displayed by the system.

Paired Operation

Paired Electrical Connections

Wiring instructions for connecting two operators in paired mode.

Related product manuals