EasyManua.ls Logo

Cape Dory 270 - Dealers Commissioning Checklist

Default Icon
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DEALER’S COMMISSIONING CHECKLIST
Model_____________________________Hull Number_________________________________
Owner’s Name and Address _______________________________________________________
______________________________________________________________________________
Dealer_________________________________________________________________________
Date Sold__________________________ Date Launched_______________________________
* Indicates further information and/or drawings elsewhere in manual
1.1 Date Initials Receiving Record
1. __________ ___________ * All items on receiving checklist received in good order.
Dealer should notify factory within ten (10) days of
receipt, of any shortages or damaged goods.
PRE-LAUNCH CHECKLIST
2. ___________ ___________ Visually check underwater hull surface for any damage
sustained during trucking or handling.
3. ___________ ___________ Thru hulls all tight and clear of any foreign objects.
4. ___________ ___________ * Seacocks and valves all closed. Hose clamps tight.
5. ___________ ___________ * Check two propeller retaining nuts for tightness. Cotter
pin in place and bent over (applies to 27, 28 and 30 only).
Record propeller information below:
Diameter_________________inches
Pitch____________________inches
Rotation _______________left or right hand
# of Blades________________2 or 3 (optional)
On Cape Dory 25’s it is sometimes easier to install
outboard motor prior to launching. Check clearances and
propeller angle.
6. ___________ ___________ *Rudder swings freely side to side. (On CD-30’s with
worm drive steerers, wheel must be turned.)
7. ___________ ___________ *Stuffing box packing adjusted (applies to 27, 28 and 30
only).
www.capedory.org - 9 -

Table of Contents