NOTES:
1. Unit must have clearances as follows:
Top — Do not restrict.
Sides and End — 6 (1.8 m) from solid surface.
2. Temperature relief devices located on suction line,
liquid line and filter drier of each circuit and have
1
/
4
flare connection.
3. Dimensions are in mm [inches].
4. Allow 8 ft (2.4 m) of service access on either side of
unit for condenser coil removal.
a30-4734
LEGEND
HR — Heat Reclaim
MCHX — Microchannel Condenser Coil
PRV — Pressure Relief Valve
Fig. 4 — 30RB060-080 Air-Cooled Chiller with Heat Reclaim Option Dimensions