INSTALLATION, OPERATION AND
MAINTENANCE INSTRUCTIONS
Air-Cooled Liquid Chillers
30RBM 160-520
30RBP 160-520
Translation of the original document 23539, 10.2016
Unit with low noise level option
Nominal cooling capacity 164 - 528 kW 50 Hz
Unit with low noise level option

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Carrier 30RBP 260 and is the answer not in the manual?

Carrier 30RBP 260 Specifications

General IconGeneral
BrandCarrier
Model30RBP 260
CategoryChiller
LanguageEnglish

Summary

Carrier Air-Cooled Liquid Chillers

Introduction to Carrier Liquid Chillers

Protection Device Safety Considerations

Do not obstruct protective devices; ensure proper fitment and function.

Refrigerant Handling and Safety Precautions

Handle refrigerant with care, follow safety guidelines, and use proper equipment.

Installation Safety Guidelines

Inspect for damage, ensure proper installation environment, and follow regulations.

Maintenance and Repair Safety Procedures

Follow procedures, use PPE, and ensure unit is de-energized before maintenance or repairs.

Receiving and Positioning the Unit

Unit Physical and Electrical Data

Electrical Connection Procedures

Power Supply Requirements and Phase Imbalance

Specifies power supply needs, checks voltage imbalance, and recommends wire sections.

Unit Application Data and Operating Ranges

Unit Operating Ranges

Specifies operating limits for water and air temperatures for various conditions.

Water Connections and Fluid Recommendations

Water Connection Precautions and Diagrams

Recommendations for connecting hydronic circuits and fluid compatibility.

Cavitation, Flow Detection, and Frost Protection

Details pump cavitation protection, flow detection, and frost protection measures.

System Water Flow Rate Control

Flow Control: Variable Speed Pump Modes

Adjusting pump speed via pressure or temperature differential, or fixed flow rate.

System Start-Up Procedures

Pre-Start-Up Checks and Commissioning

Comprehensive checks and procedures for commissioning the unit by qualified personnel.

Essential Start-Up Checks

Key checks for compressors, hydraulics, and refrigerant charge before operation.

Unit Components and Operating Characteristics

Standard Maintenance Procedures

Level 1 and Level 2 Maintenance Tasks

Simple user checks and more advanced electrical/hydraulic/mechanical checks.

Level 3 Maintenance and Tightening Torques

Advanced maintenance, electrical connection, and fastener tightening.

Final Shutdown and Disposal Procedures

Installer Start-Up Checklist

Checklist: Preliminary Information and Equipment

Fields for job details, contractor, equipment, and compressor information.

Checklist: Equipment and System Verification

Checks for shipping damage, installation, power supply, wiring, and air handling systems.