EasyManua.ls Logo

Carrier 33ZCFANTRM - Page 27

Carrier 33ZCFANTRM
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
3. Connect the other end of the communication bus cable
to the terminal block labeled CCN in the zone control-
ler of the first air terminal. Following the color code
in Table 3, connect the Red (+) wire to Terminal 1.
Connect the White (ground) wire to Terminal 2. Con-
nect the Black () wire to Terminal 3.
4. Connect additional zone controllers in a daisy chain
fashion, following the color coded wiring scheme in
Table 3. Refer to Fig. 25.
NOTE: The communication bus drain wires (shield) must
be tied together at each zone controller. If the communica-
tion bus is entirely within one building, the resulting contin-
uous shield must be connected to ground at only one single
point. If the communication bus cable exits from one build-
ing and enters another building, connect the shields to
ground at a lightning suppressor in each building where the
cable enters or exits (one point only).
+
-
499
RESISTOR
(SUPPLIED
W/SENSOR)
HUMIDITY SENSOR
RED
WHITE
BLACK
3 CONDUCTOR
20 AWG CABLE
SHIELD
(IF USED)
35 in-lb (4 Nm)
80...110s
HF23BJ042
Made in Switzerland
by Belimo Automation
1
0
yel
blu
ora
WIP
5K
LISTED
94D5
TEMP. IND. &
REG. EQUIP.
U
L
Class 2 Supply
LR 92800
NEMA 2
24VAC/DC
50/60Hz
3VA 2W
COM
1
2
3
blk
red
wht
+24V
RH/IAQ
GND
Fig. 22 Humidity Sensor Wiring

Table of Contents

Related product manuals