Carrier 38HD018 - START-UP PROCEDURE; Preliminary Checks; Leak Test & Evacuation; Crankcase Heater Operation

Carrier 38HD018
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table
3
Electrical
Data
(60
Hz)
OUTDOOR
i
imit
ooun
V/PH
OPER
VOLTS*
COMPR
FAN
Cl
A
MCA
MAX
FUSE
OR
HACR
TYPE
UNI
I
oonu
Max
Min
LRA
RLA
rLM
CKT
BKR
AMPS
018
52
0
84
.70
120
15
024
60.0
10.6
70
140
20
030
036
208/230-1
254
187
65
0
82
0
13.5
16
5
70
1
45
180
22
0
30
35
048
127
0
25
0
1
45
33
0
50
060
135
0
30.7
1.45
40
0
60
036
67
5
10.0
1
45
140
20
048
208/230-3
254
187
98
5
15
4
1.45
21
0
35
060
105.0
19.6
1.45
26
0
45
036
33
8
50
80
70
15
048
460-3
506
414
49
3
77
80
11
0
15
060
55
0
104
.80
14.0
20
FLA
Full
Load
Amps
HACR
Heating,
Air
Conditioning,
Refrigeration
LRA
Locked
Rotor
Amps
MCA
Minimum
Circuit
Amps
per
NEC
Section
430-24
RLA
Rated
Load
Amps
(compressor)
*Permissible
limits
of
the
voltage
range
at
which
unit
will
operate
satisfactorily
NOTE:
Control
circuit
is
24v
on
all
units
and
requires
external
power
source
Example:
Supply
voltage
is
460-3-60.
START-UP
AB
=
452
volts
BC
=
464
volts
AC
-
455
volts
Average
Voltage
=
452
+
464
+
455
3
1371
3
=
457
Determine
maximum
deviation
from
average
voltage
(AB)
457
-
452
=
5
volts
(BC)
464
-
457
=
7
volts
(AC)
457
-
455
=
2
volts
Maximum
deviation
is
7
volts.
Determine
%
voltage
imbalance:
%
Voltage
Imbalance
=
100
x
—=
1.53%
This
amount
of
phase
imbalance
is
satisfactory
as
it
is
below
the
maximum
allowable
2%.
Preliminary
Checks
1
Check
that
all
internal
wiring
connections
are
tight
and
that
all
barriers,
covers
and
panels
are
in
place.
2.
Field
electrical
power
source
must
agree
with
unit
nameplate
rating
3
All
service
valves
must
be
open.
4.
Crankcase
heater
must
be
tight
on
compressor
crankcase.
Leak
Test
field
piping
and
fan
coil
by
pressure
method
described
in
Carrier
Standard
Service
Techniques
Manual,
Chapter
1,
Section
1-6.
Use
R-22
at
approxi¬
mately
25
psig
backed
up
with
an
inert
gas
to
a
total
pressure
not
to
exceed
245
psig.
Before
starting
unit,
crankcase
heater
must
be
on
for
24
hours
to
be
sure
all
refrigerant
is
out
of
the
oil
.
To
energize
crankcase
heater,
proceed
as
follows:
set
space
thermostat
above
ambient
so
there
will
be
no
demand
for
cooling.
Close
field
disconnect.
The
crankcase
heater
is
now
energized.
IMPORTANT:
If
the
supply
voltage
phase
im¬
balance
is
more
than
2%
contact
your
local
electric
utility
company
immediately.
Unit
failure
as
a
result
of
operation
on
improper
line
voltage
or
excessive
phase
imbalance
constitutes
abuse
and
may
cause
damage
to
electrical
components.
Such
operation
would
invalidate
any
applicable
Carrier
warranty.
Evacuate
and
Dehydrate
field
piping
and
fan
coil
by
either
of
the
methods
described
in
Carrier
Standard
Service
Techniques
Manual,
Chapter
1,
Section
1-7.
A
CAUTION
Service
valves
must
be
fully
backseated
to
close
service
port.
There
is
no
Schrader
valve
at
the
service
port
and
failure
to
backseat
the
valve
could
result
in
loss
of
system
charge
or
personal
injury.
7