No. Item Outline of specifications Remarks
7
Drain pump
control
※Option
1) In cooling operation (including Dry operation),
the drain pump is usually operated.
2) If the float switch works while drain pump drives,
the compressor stops, the drain pump continues
the operation, and a check code is output.
3)
4) The drain pump doesn't stop immediately to decrease
the drain water in the drain pan when the cooling
operation (including Dry operation) was stopped and
drive the drain pump for five minutes.
If the float switch works while drain pump stops, the
compressor stops and the drain pump operates.
If the float switch keeps operating for approx. 4 minutes,
a check code is output.
Attached Drain pumpkit
(TCB-DP31CE)
Check code [P10]
(Repeats)
8
Louver control 1) Louver position setup
• When the louver position is changed, the position moves
necessarily to downward discharge position once to return to
the set position.
•
The louver position can be set up in the following operation range.
In cooling/dry operation
• In group twin/triple operation, the louver positions can be set
up collectively or individually.
2) Swing setup
• [SWING] is displayed and the following display is repeated.
In all operations
• In group twin/triple operation, the louver positions can be
set up collectively or individually.
3) When the unit stopped or the alarm was output, the louver is
automatically set to full closed position.
Alarm :
A check code is
displayed on the
remote controller,
and the indoor unit
stops.
(Excluding [F08]
and [L31])