EasyManua.ls Logo

Carrier 48LC Series - Page 189

Carrier 48LC Series
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53480263-01 Printed in U.S.A. Form S-VU-LC-4-26-02T Pg CL-1 6-19 Replaces: S-VU-LC-4-26-01T
UNIT START-UP CHECKLIST
(Remove and use for job file)
I. PRELIMINARY INFORMATION
MODEL NO ____________________________________________
JOB NAME_____________________________________________
SERIAL NO ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify installation of flue exhaust and inlet hood (48LC only) (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Verify gas pressure to unit gas valve is within specified range (48LC only) (Y/N) _____
Check gas piping for leaks (48LC only) (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat/space sensor (Y/N) _____
Verify that crankcase heaters have been energized for at least 24 hours (48LC only) (Y/N) _____
Verify configuration values for electronic controls (refer to control set-up checklist) (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage L1-L2_____________ L2-L3_____________ L3-L1_____________
Compressor 1Amps L1 _____________ L2 _____________ L3 _____________
Compressor 2 Amps / Stage 2 Amps L1 _____________ L2 _____________ L3 _____________
Supply Fan Amps L1 _____________ L2 _____________ L3 _____________
Outdoor Fan Amps L1 _____________ L2 _____________
TEMPERATURES
Outdoor-air Temperature _____________ °F DB (Dry Bulb) _____________ °F WB (Wet Bulb)
Return-air Temperature _____________ °F DB _____________ °F WB
Cooling Supply Air Temperature _____________ °F DB _____________ °F WB
Gas Heat Supply Air (48LC) _____________ °F DB _____________ °F WB
Electric Heat Supply Air (50LC) _____________ °F DB _____________ °F WB
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Controls, Start-Up, Operation, and Troubleshooting
document.

Table of Contents

Other manuals for Carrier 48LC Series

Related product manuals