CONTENTS
Page
SAFETY
CONSIDERATIONS.1
General
.1
Job
Data
.1
RECEIVING
AND
INSTALLATION.
1-10
Step
1
Check
Equipment
.1
IDENTIFY
MACHINE
INSPECT
SHIPMENT
Step
2
-
Provide
Unit
Support.4
ROOF
CURB
SLAB
MOUNT
Step
3
Provide
Clearances
.4
Step
4
-
Rig
and
Place
Unit.4
Step
5
Connect
Condensate
Drain.
5
Step
6
Install
Venting
.6
Step
7
-
Install
Gas
Piping.
6
Step
8
-
Install
Duct
Connections.7
Step
9
Install
Electrical
Connections.8
HIGH
VOLTAGE
CONNECTIONS
SPECIAL
PROCEDURES
FOR
208-V
OPERATION
CONTROL
VOLTAGE
CONNECTIONS
HEAT
ANTICIPATOR
SETTING
TRANSFORMER
CIRCUIT
PROTECTION
PRE-START-UP
.
1
0
,
1
1
START-UP
.
1
1
-
20
MAINTENANCE
.
2
0-26
NOTE
TO
INSTALLER
Before
the
installation,
READ
THESE
INSTRUCTIONS
CAREFULLY
AND
COM¬
PLETELY.
Also,
make
sure
the
User’s
Manual
and
Re¬
placement
Guide
are
left
with
the
unit
after
installation.
SAFETY
CONSIDERATIONS
Installation
and
servicing
of
air
conditioning
equipment
can
be
hazardous
due
to
system
pressure
and
electrical
com¬
ponents.
Only
trained
and
qualified
personnel
should
in¬
stall,
repair
or
service
air
conditioning
equipment.
Untrained
personnel
can
perform
basic
maintenance
func¬
tions
of
cleaning
coils
and
filters.
All
other
operations
should
be
performed
by
trained
service
personnel.
When
working
on
air
conditioning
equipment,
observe
precautions
in
the
literature,
tags
and
labels
attached
to
the
unit
and
other
safety
precautions
that
may
apply.
Follow
all
safety
codes.
Wear
safety
glasses
and
work
gloves.
Use
quenching
cloth
for
unbrazing
operations.
Have
fire
extinguisher
available
for
all
brazing
operations.
Fig.
1
-
Model
48NLT,
NMT,
NET,
NHT
and
NVT
A
WARNING
Before
performing
service
or
maintenance
operations
on
unit,
turn
off
unit
main
power
switch.
Electrical
shock
could
cause
personal
injury.
General
-
The
48NLT,
NMT,
net,
NHT
and
NVT
units
are
fully
self-contained,
combination
gas
heating/
cooling
units
designed
for
outdoor
installation.
See
Fig.
1.
The
units
are
shipped
in
a
vertical
configuration
and
may
be
installed
either
on
a
rooftop
or
converted
to
horizontal
configuration
when
placed
on
a
ground-level
cement
slab.
Job
Data
Necessary
information
consists
of:
machine
location
drawings,
piping
drawings,
field
wiring
diagrams
and
rigging
guide.
RECEIVING
AND
INSTALLATION
Step
1
Check
Equipment
IDENTIFY
MACHINE
The
machine
model
number
and
serial
number
are
stamped
on
machine
identification
plate.
Check
this
information
against
shipping
papers
and
job
data.
INSPECT
SHIPMENT
Inspect
for
shipping
damage
while
machine
is
still
on
shipping
pallet.
If
machine
appears
to
be
damaged
or
is
torn
loose
from
its
anchorage,
have
it
exam¬
ined
by
transportation
inspectors
before
removal.
Forward
claim
papers
directly
to
transportation
company.
Manufac¬
turer
is
not
responsible
for
any
damage
incurred
in
transit.
Check
all
items
against
shipping
list.
Immediately
notify
the
nearest
Carrier
Air
Conditioning
office
if
any
item
is
missing.
To
prevent
loss
or
damage,
leave
all
parts
in
original
pack¬
ages
until
installation.
Manufacturer
reserves
the
right
to
discontinue,
or
change
at
any
time,
specifications
or
designs
without
notice
and
without
incurring
obiigations.
BookM
1
4
PC
111
Catalog
No
564-920
Printed
in
U.S.A.
Form
48NT-20SI
Pg
1
11-91
Replaces:
48NT-19SI
Tab
|la|la

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier 48NLT and is the answer not in the manual?