EasyManua.ls Logo

Carrier 50FF 020 - Page 52

Carrier 50FF 020
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52
12 - FACTORY OPTIONS AND ACCESSORIES
A
A
AL
A
AL
A
A
Step 2: Replace the panel (1). The following image shows the
panel by the outer side of the 50FF/FC unit. Then x the clamps
supplied to secure the pipes (3) and (4) (M6 Allen screws).
Step 3: Remove the casing of the boiler to screw it to the panel
(1). To do this it is necessary to remove the locking screw, and
then, pull the front panel outwards and later to the top to decouple
it from points A.
Step 4: Drop the boiler on the bracket (6) and screw on the four
xings of this panel to secure (M4 Allen screws). Then reassemble
the casing.
Step 5: Finally join the boiler with the piping using elbows and
accessories factory-supplied.
Locking
screw
Clamps
M4 Allen xing
screws for the boiler
Boiler bracket
1
6
Return from
hydraulic circ.
Discharge to
hydraulic circ.
Filling
valve 1/2”
Pressure
gauge

Table of Contents

Related product manuals