51
All the units are equipped with scroll type compressors and a
phase control relay. Verify that they rotate in the correct sense
and, if not, reverse the power wires.
13 - COMMISSIONING
13.1 - Checks prior to commissioning
It is advisable to make a complete sketch of the installation
including the location of the unit and all the components used.
This will be very helpful for maintenance and repairs to the
installation.
The following must be veri ed:
- That the electrical power supply remains constant and that it
corresponds to that featured on the unit data plate.
- That the electric installation has been carried out according
to the electric wiring diagram provided with the unit (consult
the chapter on “Electrical connection”).
- The correct connection of the sensors supplied with the unit
(consult the chapter on “Electrical connection”).
- That they are no cables close to heat sources.
Once the above veri cations have been carried out, the control
circuit is supplied with voltage by the automatic control switch.
Attention: the compressor crankcase heater must be put under
voltage for 24 hours before starting the compressor.
WICHTIG: WIEDERBEHEIZUNG DER
OLWANNE
IMPORTANT: CRANKCASE HEATING
IMPORTANT: SURCHAUFFE CARTER D’HUILE
IMPORTANTE: RISCALDARE IL CARTER
DELL’OLIO
IMPORTANTE: RECALENTAMIENTO DE
ACEITE DEL CÁRTER
KOENNEN.
TO ALLOW THE COMPRESSOR(S) STARTING
AU PREMIER DÉMARRAGE OU APRÈS UNE ABSCENCE
TENSION 24 HEURES AVANT D’AUTORISER LE
DÉMARRAGE DU(DES) COMPRESSEUR(S).
AL PRIMO AVVIAMENTO U DOPO UNA INTERRUZIONE
PROLUNGATA DELLA ALIMENTAZIONE ELETTRICA,
LASCIARE LA MACCINA SOTTO TENSIONE PER 24 ORE
PRIMA DI AUTORIZZARE L’AVVIAMENTO DEL(DEI)
COMPRESSORE(I).
ANTES DEL PRIMER ARRANQUE O DESPUÉS DE UNA
AUSENCIA DE CORRIENTE POR UN LARGO PERIODO DE
TIEMPO, CONVIENE QUE LA UNIDAD ESTÉ CONECTADA
UN MÍNIMO DE 24 HORAS.
BEIDER ERSTEN INBETRIEBSETRUNZ ORDER NACH EINER
LANGEN STROMUNTER-BRECHUNG BRINGEN SIE DIE
MASCHINE UNTER SPANNUNG 24 STRUNDERLANG
BEVOR SIE DEN(DIE) KOMPRESSOR(EN) EINSCHALTEN
FOR THE FIRSTSTART OR AFTER ALONG TIME OUT OF
VOLTAGE PUT THE MACHINE ON LIVE 24 HOURS BEFORE
DE COURANT PROLONGÉE, METTRE LA MACHINE SOUS
COMPRESOR SCROLL.
COMPROBAR SENTIDO DE GIRO
COMPRESSEUR SCROLL.
VÉRIFIER LE SENS DE ROTATION
SCROLL COMPRESSOR.
CHECK SENSE OF ROTATION
Check the unit operation and verify the safety devices.
Important: As a safety feature to ensure heating of the
crankcase heater, if there is a power cut lasting over 2 hours,
the compressors will be locked. The unit must be powered for
8 hours to unlock them. The graphic terminal will displays the
time remaining until they can be unlocked.
Access panel to compressors
box on circuit 1 and recovery
circuit (optional)
Access panel
to compressors
box on circuit 2
Communication
panel between
both circuits
Models 100 to 170
Compressors of circuit 2
Compressors of circuit 1
Compressor of recovery
circuit (optional)
Models 180 to 280

Other manuals for Carrier 50FF Series

Related product manuals