START-UP CHECKLIST 50GCQ*04-06 SINGLE PACKAGE ROOFTOP HEAT PUMP UNITS
(Remove and use for job file)
I. PRELIMINARY INFORMATION
MODEL NO ____________________________________________
JOB NAME ____________________________________________
SERIAL NO ____________________________________________
ADDRESS _____________________________________________
START-UP DATE _______________________________________
TECHNICIAN NAME____________________________________
ADDITIONAL ACCESSORIES
______________________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Verify ground integrity with a continuity test (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Verify that fan assembly is free of obstructions and rotor spins freely (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage L1-L2_____________ L2-L3_____________ L3-L1_____________
Compressor Amps 1 L1 _____________ L2 _____________ L3 _____________
Compressor Amps 2 L1 _____________ L2 _____________ L3 _____________
Supply Fan Amps L1 _____________ L2 _____________ L3 _____________
Outdoor Fan Amps L1 _____________ L2 _____________
TEMPERATURES
Outdoor-air Temperature _____________ °F DB (Dry Bulb)
Return-air Temperature _____________ °F DB _____________ °F WB (Wet Bulb)
Cooling Supply Air Temperature _____________ °F
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding
sections of this Service and Maintenance document.