EasyManuals Logo

Carrier 50NQ User Manual

Carrier 50NQ
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
drain
tube
downward
at
a
slope
of
at
least
1
in.
in
every
10
ft
of
horizontal
run.
Be
sure
to
check
the
drain
tube
for
leaks.
Condensate
water
can
be
drained
directly
onto
the
roof
in
rooftop
installations
(where
permitted)
or
onto
a
gravel
apron
in
ground-level
installations.
When
using
a
gravel
apron,
make
sure
it
slopes
away
from
the
unit.
Step
3—
Duct
Connections
Model
50NQ
has
duct
flanges
on
the
supply
and
return
air
openings
on
the
side
and
bottom
of
the
unit
except
on
sizes
048
and
060.
048
and
060
sizes
do
not
have
flanges
on
side
discharge
openings.
See
Figs.
2
and
3
for
connection
sizes
and
locations.
NOTE:
The
design
and
installation
of
the
duct
system
must
be
in
accordance
with
the
standards
of
the
National
Fire
Protection
Association
for
installation
of
nonresidence-type
air
conditioning
and
ventilating
systems,
NFPA
No.
90A
or
residence
type,
NFPA
No.
90B,
and/or
local
codes
and
ordinances.
Adhere
to
the
following
criteria
when
selecting,
sizing,
and
installing
the
duct
system:
1.
Remove
appropriate
panels
from
unit
to
obtain
either
horizontal
or
down
discharge.
If
models
018
through
042
are
installed
in
horizontal
discharge
applications,
remove
side
duct
covers,
save
screws,
and
install
the
covers
on
bottom
duct
openings.
To
install
duct
covers
on
bottom
duct
openings,
remove
one
flange
which
interferes
with
heater
mounting
plate.
For
models
048
through
060
remove
either
side
or
bottom
duct
covers
as
needed
and
discard.
2.
Select
and
size
ductwork,
supply-air
registers,
and
return-air
grilles
according
to
ASHRAE
recom¬
mendations.
Refer
to
Tables
2
&
3
for
static
pressure
capability.
A
CAUTION
When
the
duct-system
fastening
holes
are
being
drilled
into
side
of
unit
instead
of
the
unit
duct
flanges,
use
extreme
care
to
avoid
puncturing
the
coil
or
coil
tubes.
See
Fig.
9.
3.
Use
flexible
transition
between
rigid
ductwork
and
unit
to
prevent
transmission
of
vibration.
The
transition
may
be
screwed
or
bolted
to
duct
flanges.
Use
suitable
gaskets
to
ensure
weather
and
airtight
seal.
4.
Install
external,
field-supplied
air
filter(s)
in
return-air*
ductwork
where
it
is
easily
accessible
for
service.
Rec¬
ommended
filter
sizes
are
shown
in
Table
4.
5.
Size
all
ductwork
for
maximum
required
airflow
(either
heating
or
cooling)
for
unit
being
installed.
Avoid
abrupt
duct
size
increases
or
decreases.
6.
Adequately
insulate
and
weatherproof
all
ductwork
located
outdoors.
Insulate
ducts
passing
through
unconditioned
space
and
use
vapor
barrier
in
accor¬
dance
with
latest
issue
of
SMACNA
and
ACC
A
mini¬
mum
installation
standards
for
heating
and
air
condi¬
tioning
systems.
Secure
all
ducts
to
building
structure.
7.
Flash,
weatherproof,
and
vibration-isolate
all
openings
in
building
structure
in
accordance
with
local
codes
and
good
building
practices.
8.
For
Canadian
Installations
Only—An
L-shaped
exhaust
duct
fabricated
of
sheet
metal
or
a
material
rated
94-5V
shall
be
used
in
the
case
of
downflow
applications.
Step
4—Electricial
Connections
A
WARNING
The
unit
cabinet
must
have
an
uninterrupted,
unbro¬
ken,
electrical
ground
to
minimize
the
possibility
of
per¬
sonal
injury
if
an
electrical
fault
should
occur.
This
ground
may
consist
of
electrical
wire
connected
to
the
unit
ground
lug
in
the
control
compartment,
or
conduit
approved
for
electrical
ground
when
installed
in
accor¬
dance
with
the
National
Electrical
Code
ANSI/NFPA-
70
(in
Canada,
Canadian
Electrical
Code
CSA
C22.1)
and
local
electrical
codes.
A
CAUTION
A
failure
to
follow
these
precautions
could
result
in
damage
to
the
unit
being
installed:
1.
Make
all
electrical
connections
in
accordance
with
the
latest
National
Electrical
Code,
ANSI/NFPA-70
and
local
electrical
codes
governing
such
wiring.
In
Canada,
all
electrical
connections
must
be
in
accordance
with
CSA
standard
C22.1
Canadian
Electrical
Code
part
1
and
applicable
local
codes.
Refer
to
Unit
Wiring
Diagram.
2.
Use
only
copper
conductor
for
connections
between
field-supplied
electrical
disconnect
switch
and
unit.
DO
NOT
USE
ALUMINUM
WIRE.
3.
4.
5.
Ensure
that
high-voltage
power
to
unit
is
within
oper¬
ating
voltage
range
indicated
on
unit
rating
plate
(Fig.
4).
On
3-phase
units,
ensure
that
phases
are
voltage
and
current
balanced.
Consult
local
power
company
for
correction
of
improper
voltage
and/or
phase
balance.
Insulate
low-voltage
wires
for
highest
voltage
con¬
tained
within
conduit
when
low-voltage
control
wires
are
run
in
same
conduit
as
high-voltage
wires.
Do
not
damage
internal
components
when
drilling
through
any
panel
to
mount
electrical
hardware,
con¬
duit,
etc.
CAUTION:
DO
NOT
DRILL
OR
SCREW
IN
SHADED
AREA
SUPPLY
5
0"1
RETURN
INLET/OUTLET
PANEL
Cabinet
Size
A
Small
Cabinet
20-1/2"
018-042
Large
Cabinet
21-1/4"
048-060
Fig.
9—Location
of
Coil
Area-
Not
to
be
Drilled
6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier 50NQ and is the answer not in the manual?

Carrier 50NQ Specifications

General IconGeneral
BrandCarrier
Model50NQ
CategoryHeat Pump
LanguageEnglish

Related product manuals