45
Piping 
Decorative Tape
Saddles 
 
19. FINISHING INSTALLATION 
 
19-1 FINISHING STEPS FOR INSTALLATION  
 
 
a. Tie together refrigerant piping, drain   hose, 
electrical connection cords. 
Form the refrigerant piping in the required direction 
and bind the drain hose, electrical connection cord and
signal line together with vinyl tape. 
• The drain hose should be always at the bottom of 
lump to assure smooth drainage.  
•  The lump must be of circular shape. 
• 
Fix piping with pipe clamps and check that any pipe 
vibrations cannot be transmitted to the building 
structure. 
 
 
 
 
 
 
 
 
 
e. Mount front panel to the top of 
indoor unit body with both hands 
and fit it to the latch of the grille 
frame. 
f. Ensure that the remote control and 
control functions are working 
properly
 
 
b. Fill the gap between the outside wall pipe 
hole and the piping with sealing wall 
sleeve, wall cap and sealer so that rain and 
wind cannot enter. 
 
 
 
 
 
 
 
g. Adjust the internal deflectors of 
supply air for correct air diffusion to 
the right or left direction as per the 
requirements for the room to be air-
conditioned 
 
c. Fix the terminal block cover by one screw.  h.  Ensure that the air distribution in the 
room is uniform by properly 
adjusting the air flow direction.
 
 
 
d. Check that the return air sensor is properly 
fixed and inside its plastic clip-on the 
indoor coil. 
i. After completion of electrical wiring 
to the outdoor unit: 
• Fasten the electrical cords with the cable clamp.
• Install again the service door. 
 
Wall Sleeve  Wall Cap  
Sealer Putty  
Outdoor side 
Indoor Side 
Electric Cables &  
Di-frost sensor cable 
Liquid Line 
Drain Hose 
Suction 
Line